Plan the physical routes, termination points, documentation and handover required for a usable network.
EasyLink / Infrastructure
Build the foundations your work depends on.EasyLink’s infrastructure department covers surveillance, structured cabling, intruder alarms, fibre deployment and VoIP deployment. Each project begins with the site, the existing environment and the people responsible for operating it.

Who this is for
Start with the environment you have.For organisations fitting out a site, extending connectivity, upgrading communications or reviewing physical systems that support daily operations. The precise deliverables, products, coverage and support responsibilities are agreed before work begins.
Areas of work
A practical look at the department.These topics come from EasyLink's supplied department map. Each one has its own design and ownership decisions.
Discuss distance, capacity, pathway and testing requirements before selecting a fibre design.
Define the purpose of coverage, camera locations, recording needs, access and retention as project decisions.
Review protected areas, alert paths, user access and maintenance responsibilities.
Map users, numbers, network readiness and continuity needs before changing voice services.
How a project takes shape
Scope first. Then the work.This is a useful sequence for planning. The delivery plan and responsibilities depend on your site, systems and agreement.
- 01Survey the site
- 02Agree the design
- 03Deploy and test
- 04Document and hand over
Questions to settle
Know what you are agreeing to.Can new infrastructure work with our existing network?
That depends on the current equipment, pathways and capacity. A site review should identify what can be retained and where changes are needed.
Who owns maintenance after installation?
The handover should record assets, documentation and the support responsibilities agreed for the project.
What should we decide before adding surveillance?
Clarify the purpose, camera coverage, access to footage, retention and applicable privacy responsibilities before installation.
Plan the next move
Tell us what needs to work better.